Journal of Computing in Civil Engineering · 2010 · 50 citations · 47 references
ArchitectureConstruction ManagementProject ManagementConstruction EngineeringConstruction SchedulingProject SchedulingConstruction PlanningDiscrete-event SimulationSimulation ModelingSystem SimulationConstructionDiscrete Event Simulation ModelsDiscrete-event SystemsOptimal Resource AllocationProject Schedule ManagementSimulation-based Stochastic OptimizationStochastic Simulation
Simulation modeling is important in predicting the productivity of construction operations and the performance of project schedules. It would be desirable if operation and project models are vertically integrated in practice. However, existing discrete event simulation systems do not allow integrating operation and project models. This paper introduces an integrated simulation system named “Construction Operation and Project Scheduling” (COPS). COPS analyzes the productivity of construction operations as well as the performance of a project schedule individually and jointly. It creates operation models, maintains these models in its operation model library, conducts sensitivity analysis with different resource combinations, finds the optimal resource combination that satisfies the user’s requirements relative to hourly production and hourly cost of the operation, feeds this information into a project schedule, and executes stochastic simulation-based scheduling. A case study is presented to demonstrate this integrated simulation system.
47
Introduction to Robust Estimation and Hypothesis Testing
Paul S. Horn, Rand R. Wilcox · Technometrics · 1998 · 400 citations
Dany Hajjar, Simaan AbouRizk · 1999 · 199 citations
Architecture, Construction Management, Systems Engineering +12