Publication | Closed Access
Multilateral System Allowing 100 Level 5 Laterals Drilled Simultaneously
13
Citations
3
References
2009
Year
Unknown Venue
EngineeringLevel 5Industrial EngineeringPetroleum Production EngineeringWell StimulationStructural OptimizationDrillingStructural EngineeringReservoir EngineeringGeotechnical EngineeringWeak Chalk ReservoirPetroleum ReservoirPetroleum ProductionHeavy Oil RecoveryWell PlacementReservoir CharacterizationDrilling EngineeringDiameter LateralFoundation EngineeringNew ConceptReservoir SimulationFormation DamageCivil EngineeringMechanical SystemsGeomechanicsFormation EvaluationConstruction EngineeringStructural MechanicsEnhanced Oil ProductionPetroleum Engineering
Abstract New completion techniques improving recovery, production rates and reducing cost and complexity are always looked for in the oil and gas industry. This paper is presenting a new concept where 100's of small level 5 laterals can be drilled simultaneously into the formation around a main wellbore. This paper presents the main concept as well as some preliminary results from qualifying the system for service in a high porosity very weak chalk reservoir. The qualification of the system is addressing three main aspects, the ability to jet a 12 meter long and 5–10mm diameter lateral, the ability to produce in high porosity weak chalk without loss of production, and simulation of production that is at least as good as or better than existing technologies like propped fractured horizontal wells, acid fractured horizontal wells and different types of openhole completions with and without liners. The experiments indicate that the system is able to achieve the results we are looking for.
| Year | Citations | |
|---|---|---|
Page 1
Page 1