International Journal of Production Research · 1992 · 33 citations · 2 references
EngineeringIndustrial EngineeringManufacturing EngineeringProduction EngineeringProduction PlanningProduction SystemsEnergy-efficient ManufacturingMachine SchedulingMulti-objective SchedulingProduction OptimizationProduction SchedulingProduction WorkflowGreedy HeuristicsInter-process CommunicationMachine SequencingManufacturing Sequence PlanningOperation SequencingProduction Scheduling OptimizationProduction SynchronizationSequence Scheduling
SUMMARY The development of strategies for sequencing slabs through the reheat furnace and rolling mill of a modern steel production facility is complicated by multiple, and often conflicting production objectives. Optimal energy efficiency through the reheat furnace may lead to inefficient rolling sequences or less than desirable product delivery schedules. Not only is model formulation complicated, but the combinatorial nature of the problem precludes optimal solution. A heuristic procedure for solving this multi-objective product sequencing problem has been developed and tested under production conditions in a Danish steel mill. The methodology, which is based on a modified ‘greedy’ algorithm is presented and results using actual production data are discussed
2
Introduction to dynamic programming
R. Larson · IEEE Transactions on Automatic Control · 1967 · 311 citations
A tutorial on heuristic methods
Edward A. Silver, René Victor, V. A. C. Vidal et al. · European Journal of Operational Research · 1980 · 134 citations