Water Resources Research · 1981 · 148 citations · 17 references
EngineeringWater Resources ManagementOptimizationSchedulingWater Resources EngineeringHydropower EngineeringHydropower OperationsHydropower SystemsSchedule OptimizationWater Supply EngineeringWater Supply OperationsHydropower DispatchHydropower OptimizationHydropower SchedulingOptimality ConditionsShort-term Reservoir SchedulingState VariablesTime-varying DelaysVariable Time Delays
This paper presents an algorithm based on the principle of progressive optimality for determining the optimal short‐term scheduling of multireservoir power systems; the method takes into account water head variations, spilling, and time delays between upstream and downstream reservoirs. The method is computationally efficient and has minimal storage requirements. The convergence is monotonic and a global solution is reached. Contrary to dynamic programing, the state variables do not have to be discretized with this method. An example consisting of four hydroplants in series is solved, and the results are presented.
17