Design and Execution of a 3000-ft Horizontal Gravel-Packed Completion (A Kazakhstan Case History)

Raymond Tibbles, Elton Blessen, Xiang Qian, Bill Steven, Carlos García Pardo, Gary Hurst, Randall Kubota, Peter Mysko

SPE Asia Pacific Oil and Gas Conference and Exhibition · 2000 · 19 citations · 4 references

Concepts

Abstract

Abstract This paper discusses the planning, design and successful execution of the first horizontal gravel pack in Texaco's remote North Buzachi field. Well NB4Z, located on land in Kazakhstan, presented extreme challenges that greatly affected the planning of the completion process. Example of the challenges include the following: The combination of a 3000-ft-long openhole lateral section in a shallow reservoir meant that the screen would be over 1000 ft into the openhole before the gravel-pack packer was connected on the rig floor.The location had a limited supply of water for completion operations. Disposal of water was also a problem.The shallow reservoir made the screen placement problematic and made the torque and drag calculation much more critical.Because of the limited number of evaluation wells, everything had to work correctly the first time; i.e., there were no learning curve opportunities. All aspects of the gravel-pack design are discussed (drilling fluid selection, torque and drag calculations, screen selection, selection of gravel-pack method, and pumping design). The successful executions of various completion phases are compared with the initial designs, and postcompletion well production is discussed. This horizontal completion set several records. Among them are records for the longest slurry pack, the longest horizontal well to be gravel packed without washpipe and the longest gravel pack using shunt screen technology. The design took an existing technology, enhanced it and stretched its application to a new limit, in the process obtaining a successful result.

References

4