Rate Allocation Using Permanent Downhole Pressures

M. McCracken, David Chorneyko

SPE Annual Technical Conference and Exhibition · 2006 · 27 citations · 3 references

Concepts

Abstract

Abstract A common industry practice is to commingle production, either downhole or at the surface. Where multiple layers are present in a reservoir, the most economical development plans often involve commingling the production of all the layers. Commingling production is also cost effective in multiple well scenarios such as on a platform. In these situations, it is challenging to determine the individual flow rates from each layer or well. One operating practice is to isolate each layer or well and determine what fraction of the total production can be attributed to each entity. This fraction is then used to allocate production until individual entity rates can be measured again. Rate allocation methods are often required by regulatory agencies and can require expensive well interventions in terms of delayed production and complex completions such as ‘smart’ wells. Today, many wells are instrumented with permanent downhole pressure gauges which are employed for performance prediction, production optimization, and other reservoir management tasks. In this paper, the use of downhole pressure data is extended to rate allocation. In terms of Darcy's Law, there is a physical link between pressure gradients and flow rates. ExxonMobil has developed a methodology to calculate bottomhole flow rates for each layer or well based on total production and the bottomhole pressure for each layer or well. This paper describes the issues involved, outlines the workflow to address the allocation, specifies the calculations involved, and uses two field examples to illustrate the method. This method shows promise for more accurately allocating production and reducing the required number of well interventions.

References

3