The Restructuring and Privatisation of Britain's CEGB—Was It Worth It?

David Newbery, Michael G. Pollitt

Journal of Industrial Economics · 1997 · 437 citations · 9 references

DOIFull text

Open access

Concepts

TL;DR

The study reports a social cost‑benefit analysis of the privatisation and restructuring of the Central Electricity Generating Board, which had been the sole electricity generator and transmitter in England and Wales until 1990. The analysis uses a social cost‑benefit framework to evaluate the economic and environmental impacts of the privatisation and restructuring. The findings indicate that privatisation produced benefits from generator efficiency gains, nuclear switching, and lower emissions, but incurred costs from higher French electricity prices, restructuring expenses, and premature gas‑fired plant investment, resulting in a net permanent cost reduction of about 5 % per year (≈40 % return on assets) while consumers and the government lose and producers gain more than the cost reduction.

Abstract

We report a social cost‐benefit analysis of the privatisation and restructuring of the Central Electricity Generating Board which generated and transmitted all public electricity in England and Wales until 1990. The main benefits came from generator efficiency gains, switching from nuclear power, and lower emissions. The main costs came from higher prices for imported French electricity, the cost of restructuring and premature investment in the gas‐fired generating plant. Our central estimate is a permanent cost reduction of 5% per year, equivalent to an extra 40% return on assets. Consumers and government lose, and producers gain more than the cost reduction.

References

9