New Slimhole Technology Maximizes Productivity in Middle East Horizontal Drilling Programs

Tariq Al-Wahedi, Mahmoud Abdel Hay, Tamer Waheed, Bobby Grimes, Sarvesh Tyagi

2005 · 11 citations · 5 references

Concepts

Abstract

Abstract Numerous operators are using advanced slimhole drilling technologies in development programs throughout the Middle East. These programs involve new and re-entry wells with long horizontal sections, typically 6" or 6-1/8" in diameter. Rollercone bits are often used in these applications because of their overall robustness, superior directional characteristics and predictable sidecutting ability. Slimhole PDC bits are run when possible, but problems with high torque, toolface control and drillstring dynamics often prevent their use. Traditionally, operators have been reluctant to attempt long runs with slimhole rollercone bits due to the potential for lost cones after undetected seal failures. An innovative new metal sealed slimhole rollercone bit was recently developed. The downsized primary metal seal has proven its ability to significantly improve bearing life and reliability. The longevity of the new bearing has allowed operators to gain considerable confidence, which has translated into more on-bottom drilling hours and a high TD rate. The metal seal is especially useful on high speed (200 – 450 rpm) steerable motor assemblies, where elastomer seals wear at an accelerated rate. The new bits are achieving over 1100 krevs at 80% reliability throughout the Middle East, while conventional elastomer sealed bits achieve only 600 krevs at 80% reliability in head to head comparisons. In Abu Dhabi, the new bits are used to drill out from 7" casing, then geosteer horizontally for 4000ft+ of limestone with a UCS between 5,000 psi and 15,000 psi. The authors will document significant cost reductions through improved bit performance from several years of drilling in active fields in UAE (2003 - Aug 2004). The primary advantage of utilizing the new slimhole bit is they can drill the horizontal section in one fast run. Historically, it takes two elastomer sealed bits to complete the hole section. Reduction in drilling time due to higher ROP and elimination of tripping for a new bit has led to significant savings in rig time while minimizing formation damage by reducing the exposure of reservoir formations to drilling fluids.

References

5