IEEE Transactions on Power Systems · 1990 · 42 citations · 4 references
EngineeringCivil EngineeringHydraulic EngineeringHydrologic ModelingWater Resources EngineeringHydropower EngineeringHydropower OperationsHydropower SystemsPower Plant OperationPower Plant Performance AnalysisRenewable EnergyBlack Start CapabilityBlack Start ControlBlack Start OperationBlack-start ProceduresCorrelation Of Simulation ResultsCritical Success FactorsHydroelectric Power GenerationHydropower Installations
A method for utilizing remote hydro generation to restart a major coal-fired generating station is described. The author documents a comprehensive black start project. It includes considerations for a black start project, details of an analytical study, identification of critical factors, development and implementation of an actual black start test, comparison of field tests with the simulation results, and the required system modifications identified during the project.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">></ETX>
4
Power System Restoration - A Task Force Report
M. M. Adibi, P. Clelland, L.H. Fink et al. · IEEE Transactions on Power Systems · 1987 · 237 citations
Engineering, Electrical Engineering, Systems Engineering +15