Energy Procedia · 2013 · 22 citations · 2 references
EngineeringChemical EngineeringOperations ManagementEnergy EconomicsEnvironmental EconomicsResource RecoveryCoal EconomicsCost Performance AnalysisGas EconomicsGas Injection ProcessesProcess EconomicsResource EfficiencyComparative Economic AnalysisDetailed Cost EstimationFacility Maintenance CostsMaintenance Labor CostsOperational Energy CostsOptimal InvestmentSulfur Removal
In this paper, a comparative economic analysis is conducted on the two kinds of acid gas treatment process, i.e. Claus sulfur recovery (CSR) and acid gas injection (AGI). The largest acid gas field in China, Puguang gas field, is used as a study case for the proposed methodology. The detailed cost of the sulfur recovery process by traditional Claus unit is compared with the one of acid gas re-injection process. On the basis of the designed process, investment scale of the two different options for acid gas process is thoroughly investigated from the following three aspects, i.e. fixed assets investment, annual operating costs including labor costs, maintenance costs, accessories consumption, etc., and energy costs including water-consuming, fuel gas, and electricity. The preliminary result shows that the investment of acid gas injection process is generally about 60% of the Claus desulfurization process, and it may show a certain fluctuation with consideration of labor costs, energy prices, project scale and other factors in Puguang gas field in China.
2
Petroleum geology of the Puguang sour gas field in the Sichuan Basin, SW China
Yongsheng Ma, Shuichang Zhang, Tonglou Guo et al. · Marine and Petroleum Geology · 2008 · 224 citations
Engineering, Earth Sciences, Geology +16
Possibilities and potentials of geological co-storage CO2 and SO2 in China
Qi Li, Xiaochun Li, Ning Wei et al. · Energy Procedia · 2011 · 33 citations · Full text
Management, Chemical Engineering, Environmental Engineering +17