Liquid Unloading in a Big Bore Completion: A Comparison Among Gas Lift, Intermittent Production, and Installation of Velocity String

Fitrah Arachman, K. Singh, James Forrest, Monas Octavianus Purba

SPE Asia Pacific Oil and Gas Conference and Exhibition · 2004 · 13 citations · 3 references

Concepts

Abstract

Abstract Liquid loading is a serious problem in low-pressure gas wells. Liquid accumulation in gas wells with inadequate energy to lift the liquid from the wellbore can cause a well to die prematurely. Various technologies are available to prevent liquid loading in gas wells. They include gas lift, intermittent production, and the installation of a velocity string. Each has applications and limitations for certain well and production conditions. Installation cost and operating cost are also important considerations in choosing the appropriate technology. This paper presents a comparison among these three different technologies applied to a low-pressure gas condensate well with big bore completion. At the early stage of production, a gas well with a big bore completion will allow high production rates (> 100 MMscfd). As reservoir pressure declines, liquid hydrocarbons and water precipitate may cause liquid loading in the wellbore. Thus, it will require more effort to unload the well. Installing a velocity string will increase the gas velocity, which will prevent liquid loading. The optimum length, diameter and position will be determined based on calculated minimum gas velocity. Gas re-injection will be based on injection rate, and period, as well as method, through tubing or annular. This study focuses on showing the best solution to obtain optimum gas recovery from both a technical and economical viewpoint. This study uses published information from the Arun field as an example, but it is applicable to any low-pressure gas condensate field with a big bore completion.

References

3