Management Science · 1967 · 27 citations · 5 references
EngineeringIndustrial EngineeringReal-time SchedulingOperations ResearchHeuristic SchedulingManagementLogisticsSystems EngineeringCombinatorial OptimizationQuantitative ManagementDesignWoolen MillScheduling ProcedureScheduling AnalysisProduction PlanningScheduling ProblemAutomationProduction SchedulingBusinessScheduling (Production Processes)Real-time Systems
The scheduling procedure of a particular production planner in a woolen mill is investigated. A model is developed which attempts to describe the planner's average behavior. Schedules are generated by this model and are compared with the corresponding schedules of the planner. Discrepancies between the planner's and the model's schedules are interpreted with respect to both the adequacy of the model and the consistency of the planner. Suggestions are made for application of the technique to real-time scheduling.
5
The New Science of Management Decision
James C. Hershauer, Herbert A. Simon · Academy of Management Review · 1978 · 3.2K citations
Various optimizers for single‐stage production
W.E. Smith · Naval Research Logistics Quarterly · 1956 · 1.8K citations
On the Job-Shop Scheduling Problem
Alan S. Manne · Operations Research · 1960 · 644 citations
Mathematical Programming, Engineering, Logistics Optimization +24