Water Resources Research · 1985 · 137 citations · 30 references
Hydropower System OperationReservoir ManagementOptimal ControlWater ResourcesEnergy ManagementOptimal Control AlgorithmEngineeringEnergy OptimizationWater EnergyHydropowerPower System OptimizationSystems EngineeringDynamic ProgrammingSuccessive Linear ProgrammingRenewable Energy SystemsOptimal System DesignLinear Optimization
Successive linear programming, an optimal control algorithm, and a combination of linear programming and dynamic programming (LP‐DP) are employed to optimize the operation of multireservoir hydrosystems given a deterministic inflow forecast. The algorithm maximize the value of energy produced at on‐peak and off‐peak rates, plus the estimated value of water remaining in storage at the end of the 12‐month planning period. The LP‐DP algorithm is clearly dominated: it takes longer to find a solution and produces significantly less hydropower than the other two procedures. Successive linear programming (SLP) appears to find the global maximum and is easily implemented. For simple systems the optimal control algorithm finds the optimum in about one fifth the time required by SLP but is harder to implement. Computing costs for a two‐reservoir, 12‐month deterministic problem averaged about seven cents per run using optimal control and 37 cents using successive linear programming.
30
The Mathematical Theory of Optimal Processes.
E. K. Blum, Pontryagin, Boltyanskii et al. · American Mathematical Monthly · 1963 · 4.3K citations
Mathematical Economics, Probability Theory, Optimal Processes
A First Course in Numerical Analysis
Herbert Maisel, Anthony Ralston · Technometrics · 1966 · 2.5K citations
Numerical Analysis, Numerical Computation, Numerical Treatment +1
Water resource systems planning and analysis
P.W. France · Advances in Water Resources · 1981 · 537 citations