New Barnett Shale Horizontal Completion Lowers Cost and Improves Efficiency

Darrel Lohoefer, James Athans, Rocky Seale

SPE Annual Technical Conference and Exhibition · 2006 · 42 citations · 4 references

Concepts

Abstract

Abstract Over the last few years horizontal completions of the Barnett Shale have advanced in an attempt to better stimulate the entire horizontal interval. One standard completion process, where the horizontal is cased and cemented, has emerged. Completing the well consists of running and setting a composite plug on coiled tubing (CT), perforating, stimulating, flowing the well back and repeating the process for the required number of stages for the well. This process is very costly and time consuming, with the added risks of having to remove the composite plugs, plus there is no viable method for re-stimulating these wells at a later date. For over three years now, a new completion system has been deployed in the Barnett Shale that is fast, efficient, less costly and provides equal to or better production than what the standard completion system offers. Using specially designed mechanical open hole packers run on the production liner, mechanical diversion in the open hole section can be accomplished at predetermined points. This provides well site flexibility in completion design, so the fracturing and stimulation process can be optimized. Each stage in the horizontal section can have a specifically designed fracturing or stimulation procedure. The system has also been designed, to allow all of the fracturing or stimulation treatments to be pumped in one continuous operation with the added benefit of re-stimulating all or selected intervals at a later date if desired. This has proven to be very cost effective and efficient, while reducing the time required to bring production on line. With a multitude of jobs completed to date in the Barnett Shale, this paper will analyze the operational efficiencies, cost benefits, reliability and production data of this completion system compared to the standard completion practices being implemented today.

References

4