IEEE Transactions on Power Apparatus and Systems · 1979 · 13 citations · 2 references
Typical Ehv InstallationReduced Insulation LevelsElectrical EngineeringEngineeringTransient ElectronicsHigh Voltage EngineeringElectrical TransmissionPower ElectronicsHigh Frequency TransientsLoad InterruptersElectrical Insulation
When de-energizing shunt reactors with load interrupters, reignitions are likely to occur. The resulting high frequency transients have been investigated for a typical EHV installation by computer studies and field tests. These transients can be eliminated or minimized by controlling the instant of contact parting. They can also be reduced by low ohmic opening resistors.
2