International Journal of Production Research · 1993 · 52 citations · 13 references
ManagementIndustrial EngineeringOperations ManagementInventory ManagementManufacturing ProcessesProduction PlanningCost FunctionsCost MinimizationCost ReductionLot SizingManufacturing Cost AnalysisSetup Time ReductionLot Size AnalysisProcess QualityProcess Quality AnalysisProcess Quality ImprovementProduction Lot SizingProduction Planning Lot SizingSetup CostSetup Cost Modeling
Abstract Previous work on setup reduction to dynamic lot-sizing with process improvement is extended. In this dynamic lot-sizing model, a new calculation of lot size is made at every setup, but the decision to invest jointly in setup reduction and process improvement is made at the initial setup. In the analysis, it is assumed that setup reduction and process quality are functions of capital expenditure. Such setup cost reductions and process quality improvements can arise from investing in new technology. A procedure is developed to find the optimal lot size, total cost, and required investments, and the solution is illustrated using declining exponential functions and power functions to model both setup cost reduction and process quality improvement. The implications of the analysis and the tradeoffs involved are discussed and illustrated numerically and graphically.
13
Dynamic Version of the Economic Lot Size Model
Harvey M. Wagner, T. M. Whitin · Management Science · 2004 · 2.1K citations
Management, Industrial Engineering, Operations Management +17
Investing in Reduced Setups in the EOQ Model
Evan L. Porteus · Management Science · 1985 · 438 citations
Management, Industrial Engineering, Operations Management +17
Material Requirements Planning
Brian Shorrock, Joseph Orlicky · Journal of the Operational Research Society · 1978 · 290 citations