Naval Research Logistics Quarterly · 1982 · 85 citations · 10 references
ManagementIndustrial EngineeringOperations ManagementProduction ControlProduction PlanningSchedulingDue-date SchedulingJob SchedulingJob SequencingMachine SchedulingScheduling TheoryStochastic SchedulingScheduling With Due DatesSequence OptimizationSequence SchedulingSingle-machine Scheduling
Abstract In this paper the n /1/ r j Σ j w j C j problem under the assumptions of nonpreemptive sequencing and sequence independent processing times is investigated. After pointing out the fundamental properties, some dominance sufficient conditions among sequences are obtained and a branch and bound algorithm is proposed. Computational results are reported and discussed.
10