Production Planning & Control · 1991 · 15 citations · 22 references
EngineeringIndustrial EngineeringManufacturing EngineeringComputer-integrated ManufacturingManufacturing SystemsSchedulingDynamic SchedulingFlexible Manufacturing SchedulingFlexible Manufacturing SystemsManufacturing AutomationManufacturing SimulationProduction SchedulingFlexible Manufacturing System SimulationHeuristic AlgorithmsManufacturingManufacturing System SimulationProduction SimulationSimulated EnvironmentsSimulation Of Manufacturing SystemsSimulation Studies
This paper evaluates the tardiness performance of a sampling-based adaptive heuristic in a dynamic manufacturing environment. A test bed, following a real world manufacturing system, has been developed. The proposed algorithm has been implemented in this simulated environment. After fine tuning the algorithm, it has been tested in various shop conditions. The results of these simulation studies are summarized.
22
S. S. Panwalkar, Wafik H. Iskander · Operations Research · 1977 · 1.3K citations
Filtered beam search in scheduling†
Peng Si Ow, Thomas E. Morton · International Journal of Production Research · 1988 · 386 citations