Spatial scheduling for shape-changing mega-blocks in a shipbuilding company
21
Citations
16
References
2011
Year
Facility PlanningEngineeringOptimisation ModelComputer-aided DesignStructural OptimizationSpace RestrictionOperations ResearchLogisticsSystems EngineeringCombinatorial OptimizationComputational GeometryEfficient Spatial ScheduleGeometric ModelingSpatial SchedulingContainerizationCombinatorial ProblemScheduling ProblemNatural SciencesCivil EngineeringProduction SchedulingScheduling (Production Processes)Construction ManagementConstruction Engineering
To overcome space restriction and to increase productivity, some shipbuilding companies use floating-docks on the sea instead of dry-docks on the land. In that case, a floating-crane that is capable of lifting very heavy objects (up to 3600 tons) is used to handle the blocks which are the basic units in shipbuilding processes, and therefore, very large blocks (also called mega-blocks) can be used to build a ship, but because there are some positional restrictions under which the mega-block assembly yard can be constructed, the space is the scarcest resource in the process. The focus of the research reported in this paper is to develop an efficient spatial schedule for the mega-block assembly yard. First, we develop a length-time two-dimensional packing model for this problem. Since the optimisation model cannot be solved using an analytical method, we propose a GA-based heuristic algorithm using computational geometry theory. Through performing a series of computational experiments, we finally show that the proposed spatial scheduling algorithm can provide solutions of good quality very efficiently.
| Year | Citations | |
|---|---|---|
Page 1
Page 1