Journal of the Operational Research Society · 1983 · 74 citations · 3 references
ManagementIndustrial EngineeringOperations ManagementProduction PlanningSchedulingDeadline AnalysisDue-date SchedulingFlow Shop SchedulingRelease SchedulingScheduling TheoryStochastic SchedulingDue Date ControlDue DatesFlow ShopFlow Shop Due-date SchedulingMaximum LatenessNo-wait Flow Shop SchedulingScheduling With Due Dates
AbstractA branch-and-bound algorithm for a two-machine scheduling problem by Grabowski is generalized to the case of an arbitrary number of machines. The lower bounds are obtained by the relaxation of the capacity constraints on the machines. An approach to strengthen these lower bounds is developed. Computational experience with 6-, 10-, 15-, 20-, 30-, 40-, 50-job problems is presented.