International Journal of Production Research · 2014 · 27 citations · 15 references
EngineeringIndustrial EngineeringManufacturing EngineeringDesign AutomationManufacturing ProcessesManufacturing SystemsAssemblyAssembly AutomationAssembly SystemsDesign For AssemblyDesign For ManufacturingAir ConditionersAssembly System DesignAssembly Time EstimationManual AssemblyModular Arrangement Of Predetermined Time StandardsProduct Assembly DesignTime EstimationTime Standards
This paper aims to propose an accurate and quick assembly time estimation method using the modular arrangement of predetermined time standards in the product design stage. It describes a classification of 2382 assembly operations that are incurred in manually assembling consumer electronics such as air conditioners, washing machines and refrigerators, and a method of choosing representative motions comprising work elements by examining the frequency distribution of the assembly operation’s motions. It then presents criteria for assigning time values associated with the movement of the representative motions using the design factors employed in design for assembly and the layout factors of an assembly line. A case study then presents the practicality of the method, the statistical results of which indicate that the proposed method would be accurate enough for practical purposes.
15
Product design for manufacture and assembly
G. Boothroyd · Computer-Aided Design · 1994 · 1.7K citations
Engineering, Industrial Engineering, Manufacturing Engineering +12
Design for Assembly and Disassembly
G. Boothroyd, Leo Alting · CIRP Annals · 1992 · 457 citations
Engineering, Manufacturing Engineering, Systems Engineering +10
G. Boothroyd, W.A. Knight · IEEE Spectrum · 1993 · 258 citations