Publication | Closed Access
A heuristic rescheduling algorithm for computer-based production scheduling systems
89
Citations
3
References
1993
Year
EngineeringIndustrial EngineeringSoftware EngineeringOperations ResearchSystems EngineeringLogisticsAbstract GenerationScheduling Binary TreeComputer EngineeringManufacturing SystemsScheduling (Computing)Computer ScienceNew Production SchedulesScheduling AnalysisHeuristic Rescheduling AlgorithmScheduling ProblemAutomationProduction SchedulingScheduling (Production Processes)Industrial Informatics
Abstract Generation of new production schedules in response to changes that take place on a factory shop-floor is a common requirement in today's complex and flexible manufacturing environment. The current approaches use either a regeneration rescheduling method, which results in unsatisfactory response times or methods that need too much manual intervention for identifying the operations to be changed. We propose a new rescheduling algorithm to address these problems. Our algorithm is based on the construction of a scheduling binary tree and a net change concept adopted from MRP system. It revises schedules by rescheduling only those operations that need to be revised. Our algorithm can be embedded in existing simulation-based scheduling systems or electronic Gantt chart approaches to improve their effectiveness.
| Year | Citations | |
|---|---|---|
Page 1
Page 1