2011 · 10 citations · 0 references
EngineeringCivil EngineeringPetroleum EngineeringDrillingDrilling EngineeringSubsurface Fluid FlowDeepwater DrillingDrilling HydraulicsDrilling OperationsLost Circulation ControlWell PlanningWellbore HydraulicsCirculationDrilling RigsLost CirculationLost Circulation ManagementLost Circulation PreventionLost Circulation RemediationSevere Lost CirculationWellbore Design
Abstract Loss of circulation during the drilling stage in wellbore construction is a common issue, especially in a wildcat well. However, exploration is required to increase the reserves, and it frequently has to be performed in areas of difficult access and in deeper-water wells. Loss of circulation can significantly increase the operation cost, delay the drilling program, and can involve risks for the stages or even the well. It usually consumes more resources, such as mud, rig time, logistics, and modifications in the survey, etc. The outcome can be an ineffective use of time during well construction. A version of this paper was presented at PECOM 2009 in Mexico during the transformation through innovation providing an in-depth view of the current Mexican critical-technology issues. This manuscript focuses on how a severe loss of circulation was treated using a heat-activated, rigid rapid-fluid treatment, restoring full circulation and successfully increasing the window gradient in the first attempt in a deepwater wildcat well in the northern Gulf of Mexico. An engineered solution was proposed for the placement and calculations. It was verified through laboratory tests and in the field. In addition, this paper discusses the results of the application and how it was applied in the next drill stage based on a drill, tack-and-squeeze methodology. This method has become an alternative solution for the operator in this kind of well.