Journal of Canadian Petroleum Technology · 2011 · 23 citations · 1 references
EngineeringCivil EngineeringArtificial LiftHydraulic EngineeringHydraulicsArtificial Lift SystemsGas Lift SystemsSteam-assisted Gravity DrainageWell CompletionWell Completion DesignWellbore Completion DesignAnnular Fluid ReturnArtificial Lift CompletionGas Lift OperationsGravity Drainage MechanismsProcess RestartRestartSteam-assisted Gravity Drainage CompletionTubing Design
Summary With steam-assisted-gravity-drainage (SAGD) operations, there will be times that the producer downhole temperature falls below the desired level. This situation may occur when a shut-in is required because of facility or well operational issues. Cooling bitumen and steam condensate, which continue to drain and raise the liquid level over the producer, cause difficulties with the restart. The producer could also cool if the well pair is converted prematurely from circulation to full SAGD mode. A variety of artificial-lift technologies have been applied in field applications. However, with its dual-tubing-completion design and gas lift system, Devon has successfully used partial SAGD methods to optimize restart strategies and effectively deal with times when the producer unexpectedly cools. This paper describes three SAGD operating modes used by Devon at Jackfish: full SAGD, semi-SAGD, and partial SAGD. During partial SAGD, the fluid return from the injector stops while steam injection continues down either the long tubing (LT), short tubing (ST), or the annulus. The producer continues to be circulated with the appropriate steam-injection rate into the LT and fluid returns up the ST. Numerical-simulation results associated with partial SAGD are presented. Partial-SAGD applications at the Jackfish SAGD project are discussed.
1
Jean-Louis Beauquin, Felix Ndinemenu, Gilles Chalier et al. · SPE Annual Technical Conference and Exhibition · 2007 · 21 citations
Engineering, Mechanical Engineering, Petroleum Engineering +11