Chinese Physics C · 2009 · 15 citations · 1 references
EngineeringElectrical EngineeringInstrumentationMicroelectronicsPlasma PhysicsAccelerator PhysicsAccelerator ShieldingHigh-frequency Semiconductor DevicesRadiation InstrumentationBeam InjectorsBeam InstrumentationCommissioningHeavy-ion AcceleratorsIon Beam ExtractionMultiple Injection StrategiesRise TimeStacking
The construction and commissioning of HIRFL-CSR were finished in 2007. From 2000 to 2005 the subsystem and key devices of CSR were successfully fabricated, such as magnet, power supply, UHV system, e-cooler, electric-static deflector with the septum of 0.1 mm, and the fast-pulse kicker with the rise time of 150 ns. After that the CSR commissioning activities were performed in 2006 and 2007, including the accumulation of those heavy ions of C, Ar, Kr and Xe by the combination of stripping injection (STI) or multiple multi-turn injection (MMI) and e-cooling with a hollow e-beam, wide energy-range synchrotron ramping by changing the RF harmonic-number at mid-energy, the beam stacking in the experimental ring CSRe, the RIBs mass-measurement with the isochronous-mode in CSRe by using the time-of-flight method, and the ion beam slow-extraction from CSRm.
1
The heavy ion cooler-storage-ring project (HIRFL-CSR) at Lanzhou
Wenlong Zhan, Youjin Yuan, M. T. Song et al. · Nuclear Instruments and Methods in Physics Research Section A Accelerators Spectrometers Detectors and Associated Equipment · 2002 · 446 citations
Engineering, Electrical Engineering, Nuclear Engineering +11