International Journal of Production Research · 1984 · 70 citations · 5 references
EngineeringIndustrial EngineeringManufacturing EngineeringManufacturing ProcessesProduction EngineeringSchedulingContinuous Flow ManufacturingJob SequencingMachine SchedulingProduction SchedulingContinuous FlowEquipment Idle TimeHeuristic SchedulingIdle Time ReductionIdle TimeoutManufacturing OptimizationProcess Waiting Time
This paper describes an industrial scheduling problem taken from a cable manufacturing process. An heuristic solution procedure known as the CMD rule is presented for this multi-product, multistage, continuous flow problem. The solution procedure is designed to minimize the sum of idle time of machines and in-process waiting at the second stage. A comparison of this rule with some standard scheduling rules is provided.
5