2006 · 14 citations · 7 references
EngineeringOperations ManagementPetroleum EngineeringDrillingDrilling EngineeringReservoir EngineeringDrilling OperationsDrilling OptimizationOffshore DrillingOffshore Reservoir EngineeringWell PlanningDrilling Cost AnalysisDrilling Cost OptimizationDrilling RigsFabric DevelopmentField Development Planning
Abstract An innovative two-well Low Cost Drilling (LCD) programme has been executed to exploit small, un-drained oil targets in the Andrew field. The wells have been drilled with 10% fewer offshore drilling crew, enabling critical back-to-back inspection and fabric maintenance to continue. Reserves targets have been met and costs reduced by 35%, allowing access to other smaller targets and extending field life. Three questions needed to be satisfied throughout the program. Is the oil there; can we access it cost effectively and can the platform accommodate the work? In 2004, we accepted the challenge to identify and develop these targets and embarked on a 3-point program to: (1) Better define oil targets using 4D seismic and Top Down Reservoir Modelling (TDRM) techniques to address uncertainty; (2) Minimize offshore drilling support by using an Onshore Operations Centre (OOC). Only 80 beds are available for managing the delivery of all aspects of the business. (3) Minimise drilling cost through sidetracking, de-scoping and executing preparatory well work prior to full rig mobilization. Highlights include drilling the 6" hole section in a single run using agitators to maximize ROP by maintaining WOB transfer and simplifying completions to use pre-drilled liners, isolating the production zones using swell packers. This success has been achieved through innovation, technology and adopting industry best practice, with meticulous planning and outstanding teamwork between operations, subsurface and drilling, both onshore and offshore.
7
Glyn Williams, Mark Mansfield, D. G. MacDonald et al. · SPE Annual Technical Conference and Exhibition · 2004 · 128 citations
Engineering, Geological Engineering, Petroleum Engineering +10
Improving Team Capability and Efficiency by Moving Traditional Rig-Site Services Onshore
M. Wahlen, S. J. Sawaryn, Richard Smith et al. · All Days · 2002 · 24 citations