Publication | Closed Access
A simulation-based evaluation of the cost of cycle time reduction in Agere Systems wafer fabrication facility—a case study
50
Citations
12
References
2005
Year
EngineeringEnergy EfficiencyProcess Simulation ModelLife-cycle EngineeringSystems EngineeringSimulationSimulation-based EvaluationLife Cycle CostingModeling And SimulationCycle Time ReductionAgere Systems
| Year | Citations | |
|---|---|---|
Page 1
Page 1