ManagementIndustrial EngineeringOperations ManagementCapacity PlanningProduction EngineeringProduction PlanningFlexibility StrategyFlexible Manufacturing SystemsExpansion FlexibilityFlexibility In Production SystemsFlexible Capacity SystemsFlexible ManufacturingFlexible Production SystemsManufacturingOverinvestment In CapacityOverinvestment Problem
Abstract Capacity planning for a manufacturing line is often difficult because of changes in production demands. If the line is set up at a fixed capacity during the entire product lifetime, it is likely to have either insufficient capacity or overinvestment situations. On the other hand, any change made in capacity by adding or deleting work stations may cause line disruption and waste space. This paper presents a simple method to resolve such problems, using a direct-access material-handling system. Such a system allows construction of a flexible line that can be dynamically expanded or contracted.
3
A Proof for the Queuing Formula: <i>L</i> = λ<i>W</i>
John D. C. Little · Operations Research · 1961 · 2.7K citations
The Theory and Computation of Knapsack Functions
Paul C. Gilmore, Ralph E. Gomory · Operations Research · 1966 · 607 citations