Journal of Hydraulic Engineering · 2007 · 27 citations · 8 references
EngineeringCivil EngineeringMechanical Behavior Of MaterialsRock MechanicsStructural EngineeringBed Shear StressRock FailureEdge Pressure EffectsRiprap ProtectionShear FailureShear-out FailureStone Size MeasurementStone Size PredictionWall Stability
The results of an experimental investigation of riprap stability at wing-wall abutments are reported. The aim of the experiments was the determination of the size of riprap stones necessary to resist shear failure by the flow. The results, which were obtained under a wide range of mobile-bed conditions, are compared with predictions of riprap stone size given by existing equations. Two existing methods, with the addition of suitable factors of safety, are shown to give stable stone size for riprap layers at wing-wall abutments under mobile-bed conditions. It is noted that consideration needs also to be given to filter protection, edge effects, and the effects of bed-form undermining in the design of such riprap layers.
8
Mechanics of Riprap Failure at Bridge Piers
Yee‐Meng Chiew · Journal of Hydraulic Engineering · 1995 · 287 citations
Stability of Riprap at Bridge Piers
A. C. Parola · Journal of Hydraulic Engineering · 1993 · 74 citations
Scour Countermeasures for Wing-Wall Abutments
Bruce W. Melville, Sjoerd van Ballegooy, Stephen E. Coleman et al. · Journal of Hydraulic Engineering · 2006 · 39 citations