Abstract The Bati Raman field is the largest oil field in Turkey and contains some 1.85 billion barrels of oil initially in place. The oil is heavy (12 °API) with high viscosity and low solution gas. Primary recovery has been inefficient, less than 2% of OOIP. Over the period of primary recovery, from 1961 to 1986, the reservoir underwent extensive pressure depletion from 1,800 psig to as low as 400 psig in some regions, with a related production decline from a peak of approximately 9,000 Bbls/day to 1600 Bbls/day. In March 1986, a CO2 injection pilot scheme in a 1200 acre area containing 33 wells was initiated in the west portion of the field. The gas injection was initially cyclic; "huff and puff" method was applied. Later, in 1988, the gas injection scheme was converted to a CO2 flood process. Later, the process was widespread to cover the whole field. A peak daily production rate 13000 STB/d was achieved in 1993 in comparison to what would have been less than 1600 STB/d without CO2 application. However, since 1995, the field has undergone a progressive production decline to recent levels at approximately 5,500 Bbls/day. Polymer gel treatments were carried out to increase the CO2 sweep efficiency and arrest the decline. Multilateral and horizontal well technology was also applied on pilot scale to reach the bypassed oil. WAG is applied widespread now. Current production is 7000 Bbls/day. This paper documents TPAO's 25+ years of experience on the design and operation of full field immiscible CO2 injection recovery project conducted in the B.Raman heavy oil field, in Turkey. The objective is to give an up-to-date status of the performance of the application; reservoir/field problems that TPAO had, unexpected occurrences and results and just a general idea of how successful the project has been.

References

2