1998 · 19 citations · 0 references
EngineeringPetroleum EngineeringDrillingSand ControlWater TreatmentDrilling FluidsHole CleaningOpen Hole Sand ControlSand Control Completion DesignScreen PluggingFilter Cake PermeabilityHydrochloric Acid TreatmentLaboratory TestingOpen Hole Completion DesignOpenhole Screen PluggingPluggingSand ScreensScreen Damage Assessment
Abstract This paper describes mechanisms of sand control screen plugging from a range of drill-in fluids and proposes methods for minimizing plugging damage. A series of laboratory tests were performed to illustrate the importance of selecting the correct drill-in fluid, cleanup procedure and/or breaker type to give maximum productivity in a horizontal, non perforated open hole completion. The effectiveness of hydrochloric acid, oxidizing agents, and enzyme breaker in increasing the mud cake and formation permeability was investigated by targeting specific mud components in the mud cake and invaded formation. The role of drill solids and breaker effectiveness was also investigated on filtercakes produced from laboratory and field muds. An effective breaker may thus be selected for a required change in permeability of the mud cake and removing damage from the formation for optimum productivity. To identify whether the critical damage occurs at the screen or the formation during flowback, a series of dynamic filtration tests were performed using a consolidated sandstone and different water based muds. This was followed by cake cleanup using hydrochloric acid and finally flowback through the formation and different screen types. The effect of whole mud on different types of sand control screens was also investigated and recommendations are made for the field procedures to minimize screen plugging. In addition to the laboratory testing, pilot plant scale tests were carried out using a synthetic-based drilling fluid to illustrate effective screen cleanup through the correct wash fluid and cleanup procedure. P. 229