SPE Drilling Engineering · 1992 · 10 citations · 2 references
EngineeringPetroleum EngineeringDrillingDrilling EngineeringOffshore Petroleum EngineeringDrilling OperationsHorizontal DrillingHorizontal Well CompletionsWell CompletionWell Completion DesignWell PlanningCompletion DesignCompletion StrategiesCompletion-oriented Well PlanningExtended-reach Well PlanningFlow In Horizontal WellsHorizontal Well DrillingHorizontal Well PlacementHorizontal Well Planning
Summary East Cameron Block 278 Well B-12 was the first horizontal well drilled in the Gulf of Mexico. This well, located in the Texaco Inc. operated East Cameron 265 field, was drilled and completed in May 1990. The objective formation was a high-permeability, shallow, unconsolidated gas sand located about 1, 450 ft below the mudline (BML). The success of this well proved that horizontal wells are viable alternatives to extended-reach development wells from offshore platforms in the Gulf of Mexico. The cost to drill and complete this horizontal well was less than comparable extended-reach development wells drilled in the same field. A minimal increase in drilling costs accompanied by considerable savings in completion costs resulted in favorable economics for the project. Drilling a shallow horizontal well in the Gulf of Mexico presented several challenges. This paper discusses prewell planning, formulation of contingency plans, and implementation of a drilling/completion program designed to meet these challenges.
2
Drill Pipe Buckling in Inclined Holes
Rapier Dawson · Journal of Petroleum Technology · 1984 · 250 citations