Water Science & Technology · 2001 · 54 citations · 0 references
EngineeringChemical EngineeringEnvironmental EngineeringWaste ManagementWastewater TreatmentWater TreatmentBiological Treatment ProcessesNitrogen RemovalNutrient RemovalSequencing Batch ReactorsSludge TreatmentWastewater ManagementAerationNitrificationOperating ConditionsPhosphate RemovalSequencing Batch Reactor Nutrient RemovalSewage Sludge TreatmentSewage Treatment SystemsWastewater Treatment Nutrient Removal
The results obtained from the operation of a treatment system composed of an anaerobic (up-flow sludge blanket-UASB) reactor followed by an aerobic (sequencing batch-SBR) reactor treating domestic sewage are presented and discussed. The pilot plant was monitored during 6 months, aiming to obtain performance data on organic matter, nitrogen and phosphate removal under different operating conditions. The UASB reactor was operated at a constant hydraulic detention time (0) of 6 h while the SBR performance was monitored in four different duration cycles (24, 12, 6 and 4 h) corresponding to aeration times (AT) of 22, 10, 4 and 2 h, respectively. COD and TSS overall removal efficiencies (Eo) up to 91% and 84%, respectively, were achieved independently on the aeration time applied to the SBR. In respect to nitrification and phosphate removal, AT was found to be a determining operating parameter. TKN removal of approximately 90% was achieved for AT equal to or higher than 10 h; complete nitrification occurred for AT higher than 4 h; significant phosphate removal (72%) occurred only at the AT of 2 h. It was not possible to achieve simultaneous efficient removal of nitrogen and phosphate, under the operating conditions imposed on the treatment system.