SPE Production & Operations · 2007 · 14 citations · 11 references
EngineeringPetroleum EngineeringSystems EngineeringReservoir EngineeringReservoir OperationsReservoir SimulationProductivity AnalysisReservoir ManagementReservoir OperationReservoir System OptimizationWell ModelingWell Performance AnalysisMaintenanceModel-based MaintenanceProcess DebottleneckingProduction AllocationProductivityReservoir Performance PredictionScada SystemsWell Performance Optimization
Summary Integrated Asset Modeling (IAM) is a process that combines reservoir, well, and surface-facility models to create a complete system for reservoir and well optimization. This methodology ensures that the interactions among all components are correctly simulated. To realize the full benefit of IAM models, it is critical that changing reservoir and well conditions are entered to keep the models up to date and valid. If an IAM model is not frequently and properly maintained to reflect new conditions, it will rapidly lose its value as it ceases to accurately predict well production rates and pressure drops in the system. An application tool was developed to provide easy updating and maintenance of IAM models for production optimization, surface-network debottlenecking, and production allocation. This tool automates the routine tasks required to update and maintain large-scale IAM models. The unique feature of this tool is its ability to calculate well production rates in almost real time by feeding well operating parameters obtained from the SCADA system into updated well-performance models. These production rates can be used to allocate total volumes measured at gathering centers back to individual wells. In addition, engineers can keep track of well matching parameters, such as productivity indices or skins, in the process of automatically maintaining IAM models using the sustaining integrated asset modeling (SIAM) tool. Trends in these parameters can then be analyzed to diagnose potential well problems and select workover candidates. Application of this tool in business units (BUs) has consistently resulted in a 90% reduction in model maintenance and management time, a streamlined process to maintain and update IAM models, and an improvement in production-allocation accuracy. These improvements have constituted a step change in IAM model application effectiveness across asset teams within BP.
11
The Isochronal Testing of Oil Wells
M. J. Fetkovich · 1973 · 253 citations
Engineering, Petroleum Engineering, Reservoir Engineering +12