Publication | Closed Access
New stray light test facility and initial results
15
Citations
0
References
2008
Year
Light RegulationInitial ResultsEngineeringOphthalmologyOptical DiagnosticsCalibrationOptical TestingInstrument SciencePhotometry (Optics)Pst PerformanceInstrumentationFacility InteriorInstrument DevelopmentInitial Tests
BATC has developed a new stray light test facility (SLTF) and performed initial tests demonstrating its capabilities. The facility interior is nearly all black and is a Class 5 cleanroom. Coupled with a double cylindrical chamber that reflects the specular light away from the instrument under test, the stray light control in the facility is excellent. The facility was designed to be able to test a wide variety of instruments at a range of source angles from in-field to large off-axis angles. Test results have demonstrated PST performance below 1E-9.