Publication | Closed Access
Balancing Cycle Time and Workstations
47
Citations
16
References
1989
Year
Mathematical ProgrammingCluster ComputingLoad Balancing (Computing)EngineeringIndustrial EngineeringComputer ArchitectureOperations ResearchCycle TimeSystems EngineeringLogisticsParallel ComputingCombinatorial OptimizationDesignComputer EngineeringManufacturing PlanningScheduling (Computing)Zero-one FormulationsAssemblyScheduling ProblemMechanical SystemsProduction SchedulingBusinessAssembly Line
Abstract This paper develops a model which simultaneously considers the minimization of cycle time and the number of workstations in an assembly line balancing problem. The model is developed from such known zero-one formulations as the Patterson and Albract [13] and the Thangavelu and Shetty [17] models. The flexibility provided by the model should prove especially valuable in the planning stages of a line balancing operation.
| Year | Citations | |
|---|---|---|
Page 1
Page 1