Journal of Operations Management · 2004 · 82 citations · 28 references
ManagementOperations ManagementSupply Chain ManagementOperations PlanningSchedulingSupply Chain StrategyOrder ManagementProduction SchedulingSupply Chain OptimizationVehicle SchedulingCustomer Order HandlingDynamic FeasibilitySchedule PlanningSupply Chain ForecastingVehicle Rescheduling
Vehicle supply has traditionally relied on forecast‑driven production and stock sales, incurring high holding costs, while responsive build‑to‑order systems promise shorter lead times but their dynamic feasibility remains poorly understood. This study aims to assess how changes to scheduling activities affect supply‑chain responsiveness. A simulation of a multi‑tier supply‑chain system was used to evaluate these scheduling modifications. Results indicate that existing vehicle supply systems cannot support build‑to‑order due to weak supply‑demand feedback and heavy forecasting reliance, and the paper offers recommendations to enhance scheduling toward greater customer‑order production.
Abstract Vehicle supply has traditionally been based on forecast‐driven production, and a large fraction of cars has been sold from stock—a practice which incurs considerable cost in terms of stock holding and sales incentives. Derived from successes in other industries, the benefits of responsive supply systems capable of providing customized vehicles in short lead‐times have been pointed out. While the theoretical discussion of such ‘build‐to‐order’ (BTO) strategies is well advanced, the dynamic feasibility of implementing these concepts is far from understood. Using a simulation of a multi‐tier supply chain‐system, this paper investigates the impact of altering key aspects of the scheduling activities with the objective of determining the scope for potential improvements in responsiveness of the supply chain. The simulation results show that current vehicle supply systems are not capable of supporting BTO due to insufficient feedback between supply and demand, as well as due to the strong reliance on forecasting in the scheduling process. The paper concludes with a set of recommendations on how to improve current scheduling systems towards increasing the content of vehicles built to customer order.
28
The machine that changed the world
Long Range Planning · 1992 · 5.9K citations
The Machine That Changed the World
Bernard M. Wolf · Journal of International Business Studies · 1991 · 4.8K citations