SPE Projects Facilities & Construction · 2008 · 11 citations · 4 references
EngineeringPetroleum EngineeringArtificial LiftFlow AssuranceReservoir EngineeringArtificial Lift SystemsHeavy Oil Fluid PropertiesHeavy Oil ReservoirsOffshore Flow AssuranceOffshore Reservoir EngineeringUnconventional Reservoir EngineeringArtificial Lift DesignArtificial Lift In Heavy OilArtificial Lift ModelingArtificial Lift Performance EvaluationArtificial Lift System IntegrationDeepwater Artificial LiftField Development PlanningOffshore Artificial Lift
Summary The Jubarte field, in the Campos Basin, Brazil, was discovered in January 2001. It is located approximately 80 km offshore from the State of Espírito Santo, under water depths between 1,000 and 1,500 m, containing oil of 17°API and viscosity of 14 cp at reservoir conditions. This work presents a review of the artificial lift and flow assurance aspects faced by PETROBRAS in the exploitation of Jubarte heavy oil, starting from the features of the pilot phase. It details all the challenges posed and innovations proposed and implemented for Phase 1 field development, as well as expectations for the subsequent Phase 2.
4