Offshore Technology Conference · 1973 · 22 citations · 0 references
Natural SciencesGeologyOcean EngineeringCoastal EngineeringMarine GeologyNaval ArchitectureCoastal GeologyCoastal Hazard AssessmentCoastal HazardsCoastal StructuresContinental ShelfSeafloor SpreadingCoastal Protection StructuresOffshore Hazard AssessmentOuter Continental Shelf LimitsSide-scan SonarSide-scan Sonar ImagingSide-scan Sonar InterpretationSide-scan Sonar Mapping
ABSTRACT In August of 1969, Hurricane Camille swept across the central Gulf of Mexico making landfall on the Mississippi Coast. This major storm caused the loss of many lives and considerable property damage was inflicted on the Gulf Coast from New Orleans to Biloxi. Shell Oil Company lost its South Pass 70 "B" Platform and Gulf Oil Company lost a similar platform in ft neighboring block. This paper discusses the evidence gathered in an intensive after-the-fact study conducted to ascertain the cause of failure of Shell's platform. The data include: post-Camille survey of above-water damage at other platforms in the area, topographical surveys, side-scan sonar runs, soil borings, and detailed diving and underwater television surveys of the fallen structure. The data conclusively show that the South Pass 70 "B" structure failed primarily because of sea floor soil movements. INTRODUCTION In June 1967, several Outer Continental Shelf (OCS) lease blocks in the Gulf of Mexico were offered for competitive lease bidding by the United States Geological Survey, an agency of the Federal Government. Shell Oil Company acquired the lease rights to South Pass Block 70 in that sale1 The block is located about 15 miles southeast of the Main Pass of the Mississippi River. Its location is shown in Figure 1. Initial design studies for a bottom supported drilling and production platform for this area had been under way prior to the lease sale. Soon after confirmation of bid acceptance, soil borings were taken using the well-known wire1ine technique.2 While Shell's experience in the Delta region had led us to expect weak clay soils, the extent and depth of the very weak clays which were found in the boring program were unexpected. An immediate concern revolved around appropriate design approaches to withstand lateral and axial pile loadings. A second, and ultimately much more serious problem, was soon hypothesized; i.e., the soils were so weak that soil movements caused by slumping or sliding actions might take place. Thus, while the design proceeded, an extensive program of research and field work to evaluate the probability of sea floor movements was undertaken. Because of the very weak near surface soils, the bottom of the structure was extended into the soil (see Figure 2). Although this extension provided for increased stability during installation and reduced lateral deflections under routine wave loading, the structure was not designed to resist a massive soil movement of the type which occurred. In late 1968 and early 1969, three platforms were installed in the general area one in South Pass 61 by Gulf Oil Company and two in South Pass 70 by Shell Oil. The resulting oil field became officially known as the South Pass 61 Field. The two Shell structures were named South Pass 70 "A" and 70 "B" Platforms.