IEICE Transactions on Information and Systems · 2010 · 17 citations · 9 references
ManagementComputer ScienceIndustrial EngineeringAlgorithmsOptimizationSchedulingConstraint SatisfactionJob SchedulingJob Shop SchedulingMachine SchedulingOpen Shop SchedulingBoolean SatisfiabilityBoolean Satisfiability ProblemComplexity Of SatisfiabilityLower BoundsSatisfiabilitySatisfiability ProblemScheduling ProblemsUpper Bound Computation
This paper tries to solve open Job-Shop Scheduling Problems (JSSP) by translating them into Boolean Satisfiability Testing Problems (SAT). The encoding method is essentially the same as the one proposed by Crawford and Baker. The open problems are ABZ8, ABZ9, YN1, YN2, YN3, and YN4. We proved that the best known upper bounds 678 of ABZ9 and 884 of YN1 are indeed optimal. We also improved the upper bound of YN2 and lower bounds of ABZ8, YN2, YN3 and YN4.
9
A very fast TS/SA algorithm for the job shop scheduling problem
Chao Yong Zhang, Peigen Li, Yunqing Rao et al. · Computers & Operations Research · 2006 · 255 citations