Production Planning & Control · 2015 · 15 citations · 28 references
ManagementIndustrial EngineeringProject ManagementOptimizationProject SchedulingSchedulingPrecedence RelationshipsResource SchedulingResource-constrained SchedulingSchedule OptimizationScheduling OptimizationCritical Chain SchedulingHeuristic AlgorithmsMulti-mode Project SchedulingMulti-mode Resource-constrained Project SchedulingPrecedence RulesPriority Scheduling PoliciesProject Scheduling Under Precedence ConstraintsResource-constrained Project Scheduling
Although considerable research effort has been directed at the development of the critical chain method (CCM), the existing research is based on the assumption that each project activity is performed with only one execution mode, and thus, its decision-making ability and application scopes are limited. This article aims to evaluate the performances of the priority rules for the critical chain project scheduling problem with multiple execution modes. Firstly, a multi-mode critical chain project scheduling problem (MCCPSP) is formulated, in which precedence relationships, resource constraints, multiple modes and the characteristics of the CCM are all considered. Subsequently, the heuristic solution of MCCPSP is designed, and the priority rules used in resource-constrained project scheduling problems are built into the heuristic of MCCPSP. Finally, a large number of existing priority rules are evaluated on the PSPLIB data sets by computation experiments. The computational results show that the activity priority rule GRD and mode priority rule least total resource usage have the performances for MCCPSP.
28
Computer Integrated Manufacturing Systems
Elsevier Sdol · 2009 · 931 citations
Engineering, Manufacturing Engineering, Systems Engineering +12
IEEE Transactions on Automation Science and Engineering · 2006 · 713 citations