Publication | Open Access
Analysis and Identification of Floating Capacity Bottlenecks in Metallurgical Production
14
Citations
0
References
2006
Year
The article constitutes a procedure for the analysis and identification of floating capacity bottlenecks in metallurgical \nproduction. The procedure conceived is based on the use of detailed capacity calculations, the output of which is \nthe determination of the hourly output of the floating capacity bottleneck depending on the production schedule. \nApplying the said procedure is illustrated by the example of output analysis of a line for the cutting of hot rolled bars. \nAnalysis and identification of the floating capacity bottlenecks subsequently becomes the starting point for applying \nthe principles and tools of the Theory of Constraints (TOC) in material flow control in metallurgical plants.