Preliminary Evaluation of Flight Delay Propagation through an Airline Schedule

Roger Beatty, Rose Y. Hsu, Lee Berry, J. A. Rome

Air Traffic Control Quarterly · 1999 · 175 citations · 0 references

Concepts

TL;DR

Airline schedules depend on coordinated use of resources, and when airport capacity falls below demand, initial delays cascade downstream as crews and aircraft become unavailable for subsequent flights. The study introduces a delay‑multiplier metric to quantify this propagation and evaluates it on American Airlines data, while also proposing further analyses to examine how the multiplier varies with arrival airport and airline connection models. The authors develop the delay‑multiplier concept and assess its performance using American Airlines operational data. Results indicate that the delay multiplier offers a simple measure of schedule impact, providing airlines and the FAA with actionable input to reduce the system‑wide effects of initial delays.

Abstract

Airline schedules are based on the carefully-planned use of resources, airports, planes, crews, etc., to provide passengers with on-time arrivals. When airport capacity is reduced below demand, the schedule can no longer be maintained and arrivals are delayed. Once initial delays take place, additional downstream delays frequently follow because crews and planes are not available for these later flights. The present analysis develops the concept of a delay multiplier to quantify this propagation, and evaluates the proposed metric using American Airlines' data. The delay multiplier appears to provide a relatively simple measure of how delay impacts an airline's schedule and thus provide an input to airline and FAA decisions, and thus help minimize the system impact of initial delays. Additional analyses to better understand how the delay multiplier changes with arrival airport and differences in airline connection models are warranted.