eCite Digital Repository (University of Tasmania) · 2010 · 24 citations · 0 references
Natural ResourcesHydrologyWater Resources ManagementCatchment HydrologyClimate Change Impacts On WatershedsHydrologic ForecastingCatchment HydrometeorologyCatchment ManagementCatchment ResponseCatchment StorageCatchment Water BalanceRainfall-runoff ProcessesCatchment Runoff ImpactsClimate Change Impacts On Catchment HydrologyClimate Change Impacts On RunoffClimate Change ScenariosClimate FuturesProjectionsRunoff Response To Climate ChangeSeasonal Runoff Variability
The report sets out projected river flows, to 2100, for more than 1900 subcatchments in 78 river catchments that cover more than 70 per cent of the State by area. The future operations of Tasmania’s hydro-electric system and 14 major irrigation storages were also simulated to 2100. Climate Futures for Tasmania has produced sophisticated projections of changes to runoff and river flows for Tasmania to 2100 in response to rising greenhouse gases. • In a changing climate, seasonal runoff is projected to change differently in different regions. • Runoff is projected to decrease markedly in the central highlands by 2100. • Runoff is likely to increase in the important agricultural regions of the Derwent Valley and the midlands. In a changing climate, some river flows will decrease and some will increase by 2100, and 32 of the 78 modelled rivers are projected to change by more than 10% by 2100. • Some catchments are likely to contain areas of both increased and decreased runoff within a single catchment. • By 2100, large irrigation storages fed from runoff from the central highlands are likely to have reduced inflows. • By 2100, large irrigation storages supplying the Macquarie and Coal River catchments are projected to experience increased inflows. Tasmania’s hydro-electric systems covers a large area of the state and includes two of Australia’s largest reservoirs: Lake Gordon/ Pedder and Great Lake. • By 2100, climate change is likely to reduce inflows to catchments used for hydro- electric power generation and this could reduce the power generation capacity of the Hydro Tasmania hydro-electric system.