ManagementComputer ScienceProject ManagementCost ManagementPredictive AnalyticsSoftware EngineeringActual CostCost AnalysisCost EstimationCost PlanningProject Cost ManagementSoftware Project ManagementAccuracyCost ModelsParametric Cost EstimationParametric Regression ModelsPredictive PerformanceProject EstimationSoftware Estimation
Abstract There are many sophisticated parametric models for estimating the size, cost, and schedule of software projects. In general, the predictive accuracy of these models is no better than within 25 percent of actual cost or schedule, about one half of the time (Thibodeau, 1981; IIT Research Institute, 1988). Several authors assert that a model's predictive accuracy can be improved by calibrating (adjusting) its default parameters to a specific environment (Kemerer, 1987; Van Genuchten and Koolen, 1991; Andolfi et al. 1996). This paper reports the results of a long-term project that tests this assertion.
5
Software engineering economics
Hakan Erdogmus, Barry Boehm, Warren Harrison et al. · 2002 · 355 citations
IEEE Transactions On Software Engineering
IEEE Transactions on Computers · 1978 · 117 citations
On the use of software cost models
Michiel van Genuchten, Hans Koolen · Information & Management · 1991 · 32 citations