Journal of the Construction Division · 1981 · 163 citations · 0 references
ArchitectureCivil EngineeringConstruction ManagementConstruction SchedulingProject SchedulingSchedulingLinear SchedulingSchedule OptimizationConstruction Schedule OptimizationGraphical ModelsHighway ConstructionInfrastructure Construction SchedulingState-of-the-art Review
A state-of-the-art report is presented on a graphical method for scheduling construction projects. Sometimes called the linear balance method or linear scheduling method, the method is particularly applicable to linear projects such as highways, runways, railways, tunnels and pipelines. A critical review and assessment is made of the method, including its possibilities for use in United States highway construction and maintenance projects.