Publication | Closed Access
Interim Reliability Evaluation Program procedures guide
23
Citations
0
References
1983
Year
Software Reliability TestingEngineeringEducationRisk AnalysisSystem ReliabilityIrep AnalysisProgram EvaluationReliability EngineeringPlant SystemsRisk ManagementProbabilistic Safety AssessmentSystems EngineeringReliability AnalysisAssessmentStatisticsReliabilityEvaluationRisk AssessmentReliability ModellingSoftware TestingReliability ManagementPhase IiEmergency Medicine
This document presents procedures for conducting analyses of a scope similar to those performed in Phase II of the Interim Reliability Evaluation Program (IREP). It documents the current state of the art in performing the plant systems analysis portion of a probabilistic risk assessment. Insights gained into managing such an analysis are discussed. Step-by-step procedures and methodological guidance constitute the major portion of the document. While not to be viewed as a cookbook, the procedures set forth the principal steps in performing an IREP analysis. Guidance for resolving the problems encountered in previous analyses is offered. Numerous examples and representative products from previous analyses clarify the discussion.