An evaluation of maintenance policies for flexible manufacturing systems

Michael L. Vineyard, Kwasi Amoako‐Gyampah, Jack R. Meredith

International Journal of Operations & Production Management · 2000 · 52 citations · 14 references

Concepts

Abstract

This paper presents the results of a case/simulation study that evaluated a number of potential maintenance policies for a flexible manufacturing system (FMS). Empirical data were used to structure the operation of the FMS, and to simulate its failures and repairs on the shop floor. Five maintenance policies – corrective, 30‐day preventive, 90‐day preventive, on‐failure opportunistic, and 30‐day opportunistic – were compared on four performance criteria: equipment utilization, machine downtime, through‐put, and average flow time. The “30‐day opportunistic” policy performed best overall, although the “corrective” policy was a close second, outperformed only in the area of equipment utilization. The “on‐failure opportunistic” policy performed poorly on every measure of system performance.

References

14