20th Annual Conference of the International Group for Lean Construction · 2012 · 20 citations · 2 references
ManagementConstruction ManagementProject ManagementBudgetingConstruction FinanceConstruction Project ManagementBudget JustificationProject Cost ManagementProject FinancingProject ObjectivesAllowable Cost DeterminationBudget Goal SettingEconomic Viability AssessmentGoal-driven BudgetingProject Budget ControlProject BudgetingProject Objectives FormulationProject Viability Analysis
Construction project budgets are driven by a tension between ensuring enough funds to meet goals under uncertainty and avoiding unnecessary spending, a balance that is often not achieved and can lead to project failure in either direction. This paper proposes separating the two budgeting objectives into distinct financial elements instead of a single budget. The sufficient‑funds objective is addressed by setting the budget to the client’s maximum willingness and ability to spend based on the asset’s worth, while the cost‑saving objective is achieved through shared savings arrangements.
Two opposing objectives drive construction project budgets. Budgets are driven higher by the objective of providing sufficient funds to achieve project goals in conditions of uncertainty, and driven lower by the objective of spending no more than necessary to accomplish project goals. These two risks, running out of money and leaving money on the table, are in tension and finding the balance point between them is a challenge not always met—some might say ‘infrequently met’. Projects can and do fail both ways. In this paper, it is proposed that these two objectives be pursued through two different financial elements rather than a single financial element. The objective of providing sufficient funds to achieve project goals is to be met by specifying as the project budget the most a client is willing and able to spend to achieve the goals of the project. This allowable cost is based on the worth to the client of the asset to be constructed and is the most conservative basis for budget setting consistent with project economic viability. The objective of spending no more than necessary is to be met through shared savings.
2